Wednesday 9th May - Agenda 
 Introduction (Michel Jouvin)
 •	GDB summary needed. Plan to put notes in wiki linked to agenda.
 •	Encourage cross-VO T2 deployment of perfSONAR.
 TEG next steps (Ian Bird)
 •	The TEGs as such (big working groups) have finished. Still work to be done.
 •	Further discussions at CHEP – including future of DPM.
 •	Deployment of glexec becomes a priority (tarball is not a solved problem)
 CRSG report to the C-RRB (Ian Bird)
 •	Higher rates and parking data plus more analysis means slightly more resources needed (ALICE, ATLAS and CMS)
 •	LHCb have a revised charm physics program
 •	A lot more pile-up in 2012
 •	Use of high-level trigger farms to help with processing
 •	T2 installed capacity still an issue – REBUS will be used. Need to check the figures published for each site.
 LHCOPN/ONE status & directions (John Shade)
 •	LHCOPN functioning well. Alarms: https://cclhcopnmon.in2p3.fr/LHCOPN/report/.
 •	perfSONAR-PS and MDM interoperability not tested. Jason Zurawski offering workshop on toolkit for site managers – any interest?
 •	L3VPN operations https://twiki.cern.ch/twiki/bin/view/LHCONE/WebHome.
 •	Routing policies important – symmetric paths
 •	OpenFlow as a protocol. TRILL/SPB for resilience (replace P2P links)
 •	PerfSONAR is a dormant setup with some selected core sites/points involved with regular testing.
 •	Encourage sites to install – guidelines in twiki. Sites need to setup alarms for themselves.
 Federated Identity Management for HEP (David Kelsey)
 •	Remove the ID management from the service (use single sign-on). Adding an attribute authority (e.g VOMS) adds complexity
 •	Spans many communities not just HEP – common requirements being discussed (e.g. open standards, attribute aggregation) including operational ones like traceability.
 •	Research communities are to perform a risk analysis of using IdM.
 Procedure to follow for proposed new T1 sites (Ian Bird)
 •	Policy document linked from agenda – discussed in 2011
 •	Requires expt. Support and balance against high-standards of existing T1 services.
 •	Prepare detailed plan. Follow tests and meet required service levels. Reach full status after about 1 year and Overview Board approval
 HEPiX (Helge Meinhard)
 •	23rd-27th April. Over-packed agenda. New track on business continuity
 •	Fabric management changing. Many labs moving to puppet. Quattor healthy. Some sites moving monitoring away from Nagios.
 •	Cloud computing on the horizon of realism (Openstack and OpenNebula)
 •	Working groups (virtualization; IPv6; Storage; Benchmarking)
 WLCG workshop (Jamie Shiers)
 •	wlcg workshop mailing list
 •	Draft agenda now online
 Virtualized WNs and Clouds
 HEPiX Virtualisation WG report (Tony Cass)
 •	Set up to facilitate the instantiation of user-generated VM images at HEPiX sites
 •	Image endorsement – technical constraints and policy discussed
 •	Framework for endorsers to publish has been developed
 Update on WNosDeS (Davide Salomoni)
 •	Worker nodes on demand service: http://web/infn.it/wnodes
 •	Integrates Grid and Cloud provisioning through virtualization
 •	Upcoming – dynamic VLANs
 EGI Federated Clouds Task Force (Matteo Turilli)
 •	Why? Users keen on personalized environments
 •	Federation testbed now live
 •	https://wiki.egi.eu/wiki/Fedcloud-tf:FederatedCloudsTaskForce
 VM contextualization and image cataloguing in ATLAS (Fernando Megino)
 •	Why? Some sites support multiple VOs with different needs. To be ready for when cloud resources are offered.
 •	Work ongoing over 1 year. Still manual steps. Currently use CERNVM.
 •	Contextualization desired for Gangli and Condor installs.
 •	Comment: Getting credentials in fine but concern about site settings for syslog etc. being overridden.  Condor should be via CVMFS.
  
 
 |